Supply and distribution AEP
In the city of Thoire sur Dinan, province of La Sarthe, there were installed around 2,300m of TOM® PVC-O pipes DN 110mm and DN 160mm at PN25 bar pressure for the creation of a water supply network in the same locality.
In the city of Thoire sur Dinan, province of La Sarthe, there were installed around 2,300m of TOM® PVC-O pipes DN 110mm and DN 160mm at PN25 bar pressure for the creation of a water supply network in the same locality.
The implementation of the Irrigation Plan allows the irrigation of around 600 hectares of vineyards and olive land. This Plan consists of collecting water from the industrial water treatment and pumping it into a first raft from which it proceeds to the irrigation area of Jarata and pumping it again into a second raft from which the branches carry water to irrigators.
In this project more than 20,200 m of TOM® PVC-O pipes DN100 mm to DN315 mm at pressures of 16, 20 and 25 bar were installed.
Trasformation works to improve the distribution network in which a project of special scale has been performed in the municipality of Lanciego (Álava), in an area of 800 hectares.
In this project more than 60,000m of TOM® PVC-O pipes DN110 mm to DN250 mm were installed at pressures of 12.5 and 16 bar.
The sanitation project in the cities of Brazzaville and Pointe Noire intervenes in the two main cities of Congo for a total of approximately 48.7% of the population. Among the main results of the project at the end of the 48 months provided for its implementation are: 12 Kms of sewage rainwater drainage system in Pointe Noire; and an institutional study of the consolidation strategy in the subsector.
Here more than 15,000 meters of TOM® PVC-O pipes, 110-315 mm diameter at 12.5 and 16 bar pressure have been projected.
This project is included within the action carried out in the Madrid Depura Plan which aims to preserve the available water resources with the reuse of treated water to water with recycled water all the green areas of the city, wich exceed 232 hectares, to these must be added the 80 hectares of the Humedal Park. Keeping this surface is a daily consumption of 4,000 cubic meters of water.
In this project more than 14,600m of TOM® PVC-O pipes of DN 200, 250, 315, 400 and 500mm at 12.5 bar pressure were installed.
The compensating irrigation for the municipalities in the area which will provide irrigation land with plots of fertile ground that led to the construction of resevoirs so that people could maintain the agro-livestock activity of the municipalities.
The surface of the new irrigation slightly exceeds 1,330 hectares. The distribution network waters a total of 554.94 hectares, of which 481.01 belong to Peramola and 73.93 to Basella. The total number of farms beneficiated is 103.
The construction of wastewater
The supply of drinking water to the city of Montevideo, as well as to the major cities and towns in the Canelones Department (Canelones, Pando, Toledo, Suarez, Progress, Cerrillos, La Paz, Las Piedras, Ciudad de la Costa and Costa de Oro to Salina, Cap. Juan A. Artigas, etc.) is done from the Water Treatment Plant located in the town of Aguas Corrientes, near the city of Canelones and distant about 50 km from the city of Montevideo.
This drinking water system, called "MONTEVIDEO SYSTEM" serves more than 1:700.000 inhabitants, i.e. more than half of the population of Uruguay.
The project of water supply and sanitation (AEPA) in semi-urban areas supplies 19 municipalities in six provinces in Cameroon, including the central provinces, the Far North, Littoral, West, South and South-West. These 19 municipalities are supplied from 16 water supplying systems managed by CAMWATER. This project meets the needs of drinking water and adequate sanitation of people in these communes.