This action consists in the continuation of the main pipe already installed from the dam of Rialb in Oliana (Lleida), to the crossing of the C-14 road with the Segre river, along with the construction of a pumping station and the installation of a impulsion pipe in that pumping.
This allowed to launch the first compensating irrigations by giving continuity to the works executed in the Midspan Oliana Dam and connect the secondary or distribution network.
The works consist in the execution of the adduction necessary conductions for the proper operation of the line up for the branch of the irrigation in the municipality of Oliana. Specifically, an adduction pipe is installed with a length of 1,025 meters in a diameter of 500 mm in PVC-O, and a pumping station from which there will be a pipe connecting with the distribution valve.